Boomerang Kaolin
Kula Gold Limited hosts 93.3 million tonnes of Kaolinised Granite Resource at its 100% owned Boomerang Kaolin Project near Southern Cross in Western Australia.
The JORC Resource Estimate announced July 2022 has verified the resource values for the Boomerang Kaolin Deposit as follows:
ASX Announcement Highlights – July 2022:
Read all about the impact that Metakaolin can have on the Green Construction Industry in our Presentation Highlights below.
– Resource Presentation Highlights –
Boomerang Kaolin JORC Resource Presentation July 2022
Interested in our Kaolin? Talk to us today.
Kaolin is used for a wide variety of products including: paper, china, porcelain and tableware, paint, rubber, cable insulation, specialty films and fertilisers, with new uses being discovered using this industrial clay.
As explained in our July 2022 Resource Presentation, using Metakaolin as a 15% substitute for cement in making concrete offers significant CO2 emission savings and actively promotes green construction.
Please get in touch via the contact form below or email us at cosec@kulagold.com.au to speak with our Kaolin team about our product.
Boomerang Kaolin was discovered in July 2021 and drilled out in 2021-22. Discovery to JORC Resource was completed in 12 months.
It lies in a favourable location, being ~25km from the Kalgoorlie water pipeline and Highway 94 Perth to Kalgoorlie, and 43km to the Southern Cross rail yard.
Preliminary feasibility study work suggests that the Boomerang Kaolin Deposit supports the development of a shallow, open-pit, long life mine. Metakaolin development can be facilitated with industry-standard processing technology which is relatively low-tech but highly value accretive.
The logistics associated with the mining of raw product and the conversion and shipment of Metakaolin to market are exceptional, as indicated below.
A sealed public road runs along the boundary of the tenement within 4km of the deposit. The project is located within 5km of the Marvel Loch townsite and 43km of Southern Cross which has a national rail facility running west-east for efficient transportation of end product. Water and electricity infrastructure is within 5km of the project location.
Click here for the latest news from the Boomerang Kaolin Prospect within Kula Gold’s Southern Cross Projects in Western Australia.